Corporate Overview

Nkwe Platinum’s main Tubatse and Garatau Projects consist of five contiguous farms with a strike length of more than 30km. These Projects are located in an established mining district with well developed infrastructure. It borders Anglo Platinum’s Modikwa Joint Venture to the east, Implat’s Marula mine to the north and Eastplat’s Spitzkop – Kennedy’s Vale project in the south.

Nkwe Platinum’s Tubatse and Garatau Projects have a surface footprint of more than 10,500 hectares, underlain by both the Merensky Reef and the UG2 chromitite seam from surface to a depth of 1,500m.

Nkwe has finalised a Feasibility Study on the Garatau Project Area in the north, with exploration continuing on both its Garatau and Tubatse Project Area in the south. The company’s view is to develop two mines with a combined annual production of more than 1 Moz of PGM from a targeted mineralisation base in excess of 100 Moz 3PGM Au. The potential size and quality of Nkwe’s PGM assets make it possible for Nkwe to become an independent PGM producer and strategically utilize independent or joint ventured smelting and refining capabilities.